Project
Jane Townlead
Readiness 0%admin@ruh-design.local · owner

Configure a home

Loading configurator…

Conceptual cost

draft
Estimate0018
Line items7
Total conceptual cost$274,365
Conceptual margin$129,135 · 32%
Cost contingency
Applies against estimate rev 1 · edits are revision-guarded
Priced optional scope
Estimate exports · est_0018
Checking documents
Conceptual estimate for pre-contract review; not a bid, permit document, or construction guarantee.
Estimate rev 1 · generated 2026-07-15 22:14 UTC

Takeoffs and line costs

0 lines · est_0018
Loading estimate
LineTakeoff qtyBasis unitDerived unit costConfidence
LineCost codeQtyUnitUnit costCalculatedEffectiveOverrideMarkersSrc revTrace

Select Inspect on a line to open its source trace and override drawer.

Measured takeoff (planning-grade)

Planning-grade

Envelope- and convention-based home takeoff: envelope/wall/roof/opening/drywall categories from the declared plan envelope; lot area measured from the lot polygon when present. Framing = plane areas. Elevations and options carry no geometry → honestly absent.

CategoryQuantityUnitBasis
Windows10eaassumed
Exterior man doors3eaassumed
Overhead (garage) doors1eaassumed
Total opening area295sfassumed
Envelope footprint2,856sfderived
Foundation slab2,856sfassumed
Exterior wall perimeter (per plate)220lfderived
Exterior wall length (all plates)440lfderived
Gross exterior wall area4,620sfassumed
Wall framing area (plane)4,620sfassumed
Siding (net of openings)4,325sfassumed
Exterior wall drywall (net of openings)4,325sfassumed
Roof area3,193sfassumed
Roof framing area (plane)3,193sfassumed
Conditioned floor area1,800sfderived
Ceiling drywall1,800sfderived
Interior partition drywall3,600sfassumed
Elevated floor framing area (plane)900sfderived
Lot area10,830sfmeasured
Envelope divergence. Gross envelope vs finished area: envelope footprint (2856 sf) is 3.17x the implied finished footprint (900 sf = 1800 sf / 2 stories). The 25% threshold is an exact-footprint sanity check; envelope-basis quantities (slab, walls, roof) remain a declared upper bound, not a measured home - surfaced, never averaged away.
  • openingSchedule: SFD_OPENING_CONVENTIONDeclared schematic opening convention (2/bed + 4 common windows; front/rear/garage-house man doors; overhead per garage type) — not a door/window schedule.
  • foundationType: slab_on_gradeSlab-on-grade; no footings, thickening, or slab thickness modeled.
  • floorToFloorFt: 10.5STORY_HEIGHT_FT (scheme-model3d.mjs) — the massing convention shared with 3D so takeoff and massing never disagree; not a designed section.
  • roofPitch: 6:12SFD_ROOF_PITCH 6:12 -> plan slope factor 1.118; pitch is not modeled on catalog plans.
  • partitionDrywallFactor: 2Both faces of interior partitions over conditioned area; declared factor, not a measured partition takeoff.
This is planning-grade, not bid-level output.
  • Planning-grade, not bid-grade: NOT purchasable, bid-level, or distributor-quote output — no SKUs, no waste factors, no supplier mapping (full-product-requirements.md §2.9).
  • Framing quantities are PLANE AREAS, not member counts or structural design.
  • Openings are a DECLARED schematic convention, not a door/window schedule; catalog-plan quantities are envelope- and convention-based, declared per quantity.
  • Moves NO money: line items, contingency/escalation, summaries, exports, and CSV columns are byte-identical.
  • Not a quantity survey, appraisal, or permit determination; drawings remain non-permit-ready.

The cockpit dock TAKEOFF group (scheme-level measured quantities on the Site Studio) is staged for v1.1. The live scheme takeoff is already available to agents and operators through the guarded scheme API.

Material schedule (planning-grade)

Planning-grade

Quote-ready material lines mapped from the measured takeoff and the org material catalog. Base is the converted takeoff quantity; waste is shown as its own component; purchase is base plus waste. Cost bases are the builder’s manual planning figures and are margin-visible only.

MaterialBaseWastePurchaseOrderBasisUnit costExtended
WIN-V-3x4 · Vinyl window 3'x4'
from: windowCountEa
10 ea0% · 01010
pack-rounded
assumed$285$2,850
DR-EXT-3x7 · Exterior door 3'x7'
from: exteriorDoorCountEa
3 ea0% · 033
pack-rounded
assumed$450$1,350
OHD-16x7 · Overhead door 16'x7'
from: overheadDoorCountEa
1 ea0% · 011
pack-rounded
assumed$1,200$1,200
RM-3000 · Ready-mix concrete 3000 psi
from: foundationSlabSf
4.0 in slab: (4/12) ft ÷ 27 = 1/81 cy per sf
35.3 cy5% · 1.83737assumed$185$6,849.11
FR-WALL · Wall framing package
from: wallFramingAreaSf
4,620 sf10% · 4625,0825,082assumed$7.50$38,115
SD-FC-LAP · Fiber-cement lap siding
from: sidingNetAreaSf
4,325 sf10% · 432.54,757.54,757.5assumed$6.50$30,923.75
DW-12-4x12 · 1/2" drywall 4x12 sheet
from: exteriorWallDrywallSf
4x12 sheet = 48 sf
90.1 sheet10% · 999.1100
pack-rounded
assumed$16.50$1,635.39
RF-ARCH · Architectural asphalt shingles
from: roofAreaSf
1 roofing square = 100 sf
31.9 square10% · 3.235.136
pack-rounded
assumed$125$4,390.38
FR-ROOF · Roof framing package
from: roofFramingAreaSf
3,193 sf10% · 319.33,512.33,512.3assumed$9$31,610.70
DW-12-4x12 · 1/2" drywall 4x12 sheet
from: ceilingDrywallSf
4x12 sheet = 48 sf
37.5 sheet10% · 3.841.342
pack-rounded
derived$16.50$680.63
DW-12-4x12 · 1/2" drywall 4x12 sheet
from: partitionDrywallSf
4x12 sheet = 48 sf
75 sheet10% · 7.582.583
pack-rounded
assumed$16.50$1,361.25
FR-FLOOR · Floor framing package
from: floorFramingAreaSf
900 sf10% · 90990990derived$8$7,920
Material planning total$128,886.21
  • openingAreaSfinformational
  • envelopeFootprintSfinformational
  • exteriorWallPerimeterLfinformational
  • exteriorWallLengthLfinformational
  • grossExteriorWallAreaSfinformational
  • conditionedFloorAreaSfinformational
  • lotAreaSfinformational
Distributor quotes require explicit confidence state, source provenance, estimator review, and supplier/vendor approval before being treated as purchasable or bid-level output.
  • This material schedule is not a bid.
  • This material schedule is not a purchase order.
  • These are the builder's manual planning figures, not supplier pricing.
  • The conceptual estimate total and this material planning total are different instruments and are not reconciled.

Distance to the sourced-rate floor

No rate-book mapping is configured yet, so no cost code can be sourced. Map cost codes to material items in the rate book to see how close this estimate is to the D5 sourced-rate floor.

Regeneration history

Viewing active
EstimateConfigurationStatusProvenance
0002Managed Lot 008 Mrcldpfydraftrev 1 · generated 2026-07-08T21:34:53.115Z
0003Managed Lot 009 Mrcldpgwdraftrev 1 · generated 2026-07-08T21:34:53.177Z
0004Managed Lot 010 Mrcldphqdraftrev 1 · generated 2026-07-08T21:34:53.237Z
0005Managed Lot 011 Mrcldpindraftrev 1 · generated 2026-07-08T21:34:53.300Z
0006Managed Lot 008 Mrclwruldraftrev 1 · generated 2026-07-08T21:45:43.478Z
0007Managed Lot 009 Mrclwrvndraftrev 1 · generated 2026-07-08T21:45:43.561Z
0008Managed Lot 010 Mrclwrwvdraftrev 1 · generated 2026-07-08T21:45:43.637Z
0009Managed Lot 011 Mrclwrxzdraftrev 1 · generated 2026-07-08T21:45:43.718Z
0010Managed Lot 001 Mrez3q54supersededsuperseded by 0018 at 2026-07-15T22:14:04.914Z
0011Managed Lot 002 Mrez3q6kdraftrev 1 · generated 2026-07-10T13:32:24.644Z
0012Managed Lot 003 Mrez3q7udraftrev 1 · generated 2026-07-10T13:32:24.790Z
0013Managed Lot 004 Mrez3q96draftrev 1 · generated 2026-07-10T13:32:24.939Z
0014Managed Lot 005 Mrez3qaodraftrev 1 · generated 2026-07-10T13:32:25.096Z
0015Managed Lot 001 Mrf0p0yqdraftrev 1 · generated 2026-07-10T14:14:53.795Z
0016Managed Lot 002 Mrf0p199draftrev 1 · generated 2026-07-10T14:14:54.154Z
0017Managed Lot 003 Mrf0p1jhdraftrev 1 · generated 2026-07-10T14:14:54.409Z
0018 · active · viewingManaged Lot 001 Mrez3q54draftrev 1 · generated 2026-07-15T22:14:04.914Z
Superseded estimates are retained read-only regeneration history; their CSV exports carry status and superseded provenance columns.