Scheme
approvedSite
Acreage—
Site coverage
7.06% · max 45%
Density
0 DU/ac · max 8 DU/ac
Parking
Stalls- provided · requirement not evaluated
Not modeled — no parking demand or supply on record for this scheme.
Master plan
Parcels—
Site total—
Single-use scheme on a single-parcel deployment — goes live when a scheme composes two or more use families (spec §2.5).
Earthwork
Cut170.5 CY
Fill166.1 CY
Net4.3 CY (export)
Planning-grade estimate — hover for the assumptions and exclusions.
Stormwater
Required23,594 cu ft
Provided0 cu ft
StatusNo pond drawn
Screening detention volume of 23,594 cu ft is required for the modeled impervious area, but the scheme draws no detention program space. Draw a detention pond/basin to size it.
Power
Transmission138 kV · 1920 ft · ONCOR ELECTRIC DELIVERY CO.
Mapped substationBURLESON 138 kV · 1.1 mi
Mapped generationSystem Control Center 5 MW · 2.5 mi
Utility lifecycleunknown · rev —
Utility—
Requested—
Offered—
Committed—
Service voltage—
Rough IT load~7.44 MW
Topology2N A/B · 2 trains · reserve proof unresolved
Land reservationSite electrical yard · placed · 30,002 / 30,000 sf
Land plan sourcecurrent · ruh_dc_site_utility_plan_v1
Connectivitysingle mmr · MMR 1 / 1 · paths 1 / 1
Carrier boundaryservice not established · upstream diversity not established
Phase basis1 phase · planned ~7.44 MW · located ~7.44 MW
Delivery readiness0 / 1 phases evidenced · 16 blockers
Delivery evidence0 effective · 0 recorded · 0 stale
Controls membershipEPMS 1 / 1 current · BMS 0 / 1 current
Controls evidence0 effective · 0 recorded · pins 0 current / 0 missing / 0 stale
Controls gapsDCIM not established · fire source graph not established
Energizationnot established · MW —
Resiliencenot proven
Open inputs11 unresolved
Facility requirements plus map screening only — interconnection and energization require utility studies.
Record utility lifecycle
Requested, offered, and committed MW are commercial facts only. A commitment does not establish energization or facility readiness.
Loading utility record…
Equipment, procurement and commissioning registry
Registry evidence is operator-recorded provenance, not authenticated or independently verified. Delivered is not installed; a recorded passed test is not engineering acceptance or a commissioning certificate.
Registry revision — · Source Not Established · 0 current / 0 stale events
Current itemsNo current equipment item revisions recorded.
Current testsNo current commissioning test revisions recorded.
Delivery evidence and energization gates
Thermal / water
Indoor distributionCRAH air distribution · confirmed declared
Heat rejectionAir cooled · confirmed declared
Process waterNot implied by posture · demand unknown, not zero
Mechanical yards1 source-located · 0 unlocated · shared use
Cooling redundancyUndeclared · not proven
Source-map postureUnconfirmed topology · source geometry current · acceptance not current
Thermal source areas1 / 1 assigned · 0 acceptance-current
Logical assignments0 / 0 assigned · 0 acceptance-current
Shared source0 shared dependencies · independence not proven
Thermal acceptance0 effective · 0 recorded gates · 0 source-blocked · not recorded
Thermal source pins0 current · 0 missing · 0 stale
Open inputs10 unresolved
Planning requirements only — no equipment or hydraulic engineering is inferred.